When calculating Scope 1 and 2 GHG emissions
in accordance with the GHG Protocol methodology, Nornickel takes into account
carbon dioxide (CO2), nitrous oxide (N2O), and methane (CH4). The quantification of Scope 1 and 2
GHG emissions includes the Company’s estimated prospective GHG emissions
related to the implementation of the Sulphur Project at Nadezhda
Metallurgical PlantHistorically, the GHG
emissions provision for the Sulphur Project was estimated at 2.2 mln
t of CO2 equivalent. However, in the reporting year, due
to planned reconfiguration of copper production, the prospective emissions
from the implementation of the Sulphur Project are expected
to be lower — approximately 1.2 mln t
of CO2 equivalent. This adjustment, among other factors, was also
used to restate Scope 1 and 2 GHG emissions for previous reporting
periods..
Dynamics of GHG emissions (Scope 1
+2) and removals for 2021‑2024
IFRS S2 14c
In 2024, direct and indirect
GHG emissions (Scope 1 and 2) from production and other activities
of the Nornickel Group, taking into account the adjustment
for the Sulphur Project’sDue to plans to reconfigure
copper production.GHG emissions provision, amounted
to 8.6 mln t of CO2equivalent, including 8.2 mln t of direct
emissionsIncluding a GHG emissions provision
for the Sulphur Project at Nadezhda Metallurgical Plant and
GHG emissions generated from heat and electricity supplies
to the public. In 2024, actual direct and indirect GHG emissions
(Scope 1 and 2) reached 7.5mlntof CO2equivalent, including Scope 2
GHG emissions at 0.4 mlntof CO2equivalent as well as actual
emissions from the Sulphur Project at Nadezhda Metallurgical Plant and
GHG emissions generated from heat and electricity supplies
to the public (the Sulphur Project GHG emissions provision
at Nadezhda Metallurgical Plant was determined separately).and 0.4 mln t of indirect emissions.
Over the past fouryears, the Nornickel Group has maintained
its downward trajectory in GHG emissions. In 2024, GHG emissions
decreased compared to 2023 levels, driven by:
lower per unit fuel consumption for heat and
electricity generation as a result of optimising equipment operation
modes at CHP plants
favourable weather conditions
in the Norilsk Industrial District during the autumn‑winter period
updating of regional СO2emission factors for electricity supply
within the energy systems of the Murmansk Region and
the Trans‑Baikal Territory.
The Trans‑Baikal Division signed a direct
bilateral power purchase agreement to purchase 124.9 million kWh
of electricity from a certified low‑carbon energy supplier (a hydropower
plant), driving Scope 2 GHG emissions down by more than 126 kt of CO
2equivalent in 2024.
Verification of emissions metrics
GHG emissions (Scope 1 and 2) and
removals for the Group in 2024 were verified by TÜV AUSTRIA.
Comparison with global metals and mining peersDirect and indirect GHG emissions (Scope
1 and 2) from production and other activities of the Nornickel Group,
including the Sulphur Project’s GHG emissions provision at Nadezhda
Metallurgical Plant.
GHG emissions (Scope 1 and 2)(mlntof CO2equivalent)
The comparison is based on available
data for fiscal years 2023 and 2024. Peers include leading global diversified metals
and mining companies: BHP Billiton, Rio Tinto, Vale, Glencore, and Anglo American.